Details: excavation including removal and satisfactory disposal of all materials necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross sections shown in the drawings or as indicated by the engineer and all other incidental charges etc., complete as per standard specification for boxing. providing compaction for embankment / making up of low berms using the available box cut earth including all hire and fuel charges for power roller for compaction, water sprinkler, including all labour charges for laying, spreading, watering etc., complete and as directed by the departmental engineers. granular sub-base graded material (table:- 400-1) - plant mix method (construction of granular sub-base by providing close graded material, mixing in a mechanical mix plant at omc, carriage of mixed material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve t
Sector: Road development