Details: earth work excavation in all soils and sub soils except hard rock requiring blasting including shering and shuttering and bailing out water wherever necessary refilling the sides of foundation with excavated earth in layer of 15 cm thick well rammed consolidated and depositing the surpless earth within compound in places shown by the departmental officers with all leads and lifts etc., complete. supplying and filling of good clean m- sand including cost and conveyance of material and labour charges for filling watering consolidation etc complete cement concrete 1:4:8 mix ( one cement 4 sand and eight 40 mm hbg iss metal ) using 40 mm hbg metal for foundation and basement and including cost & conveyance and all labour charges including dewatering if found necessary and said layer in not more than 15 cm thick etc., complete as per standard specification. centering the soffits of drain sides plain surface including using steel sheet with mild steel angle of size 25mm x 25mm x 3mm laid ov
Sector: Municipality