Details: protection arrangement to the inner portion of western side ash bund (ch.1700.00 to ch.2100.00 m) of primary pond-ii at ash . providing and erecting, fixing casurunia post walling support using 10 cm to 13 cm dia (vertical) and 4 cm to 5 cm dia (horizontal) casurunia posts along the banks of bund for supporting the ash filled hdpe bag stack including cost of all materials, transporting, lead, lift etc., complete as directed by the engineer at site. providing and stacking wet ash filled hdpe bags on the inner side of the bund in the western side of primary pond-ii including cost of all material labour, lead, lift etc., complete as directed by the engineer at site. (wet ash will be provided at free of cost at ash ).
Sector: Power Sector