Details: earth work excavation for foundation in hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders ss.20b and sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete foundation grade beam supplying and filling with m sand for foundation and basement including all cost and conveyance of all materials and labour charges etc. complete as per standard specification. p.c.c 1.4.8 (one cement four sand and eight aggregate) using 40mm iss hbg metal including cost and conveyance of all materials and labour charges complete as per standard specification random rubble masonry in cement motor 1:5 (one part of cement, five part of crushed stone sand (m- sand)) mix using all granite stones and
Sector: Municipality