Details: dismantling the existing brick work in cm 1:5 including labour, lead and all other cost and conveyance etc complete (pwd vol - i sor 2024-25 pg.no 27) removing the existing ac sheet including lifting, labour, lead and all other cost and conveyance etc complete (pwd vol - i sor 2024-25 pg.no 28) removing the existing doors and windows including removal of frames, hinges and fastenings including lifting, labour, lead and all other cost and conveyance etc complete(pwd vol - i sor 2024-25 pg.no 28) dismantling the existing floor finish & dadooing walls in cement mortar with mosaic tiles / glazed tiles / clay tiles / cuddapah slabs including lifting, labour, lead and all other cost and conveyance etc complete(pwd vol - i sor 2024-25 pg.no 28) earth work excavation for foundation in hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders ss.20b and sand, silt or other loose soil, wet sand,or silt not under water,
Sector: Municipality