Details: earth work excavation for foundation in all soils and sub soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation. supplying and filling foundation and basement with filling sand layers not more than 15 cm thick, well rammed, watered and compacted complete complying with standard specification. cement concrete 1 : 4: 8 mix using 40 mm hbg metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick compacting etc., complete complying with standard specifications and as directed. brick work in cm 1 : 5 mix using country bricks ground mould of size 23 x 11 x 7 cm for the following including curing etc., complete complying with standard specifications. suppling and fabricating and placing in position ms (or) r.t.s. bar for reinforcement to all rcc works as per the design given including cost of steel and binding wire also in all floors. supplying and
Sector: Municipality