Details: dismantling the existing reinforced cement concrete culvert slab including clearing away from site etc., complete dismantling the existing plain cement concrete wall including clearing away from site etc., complete conveyance of dismantling rcc & pcc with an extra lead of 2km including loading and unloading at places shown by the departmental officers. sand and silt under water s.s.20b earth work excavation on depositing other loose block to cotton soil wet and sand under water bank with initital lead of 10 m and lift of 2m on slush and silt under water upto 0.75m depth rising the manual etc. complete conveyance of removal of silt with earth work excavation with initial lead and lift with an extra lead of 2km conveyance depositing places shown by the department officers including sectioning levelling etc.complete. providing steel centering and shuttering without strutting arrangements for rcc / pcc works upto 3m height including cost and conveyance of all materials at site and all
Sector: Municipality