Details: charges for de-terminating the incoming & outgoing cable from the transformer and its distribution panel and lifting the transformer with panel about 500 mm height by using chain block. construction of rcc pedestal of size 3.0 x 1.2 x 0.5 mtrs for position of 160 kva lighting transformer with control panel in tt 7 including cost of materials. charges for providing shuttering arrangements for supporting the reinforced cement concrete surfaces for construction of new pedestal rate including cost of all labour, lead, lift, tools etc., complete. supplying fabricating and fixing in position of rts rod for reinforcement including cutting bending typing and fixing in position including cost of all materials, labour, binding wire, lead, lift, etc., complete. providing rcc 1:1.5:3 using op/pp cement with 20 to 12 mm including cost of all materials, labours, lead, lift, curing, etc., complete - excluding cost of reinforcement and form work.
Sector: Power Sector