Details: dismantling the damaged cement concrete as per the instruction of departmental officers. including all initial lead and other labour charges earth work excavation for foundation in all kinds of soils and sub soils to full depth as directed by the departmental officers except hard rock inclusive of shoring strutting and balling out water wherever necessary and refilling the sides of foundation with excavated earth in layers of 15cm thick well rammed and consolidated and depositing the surplus earth with in the compound in places shown by the departmental officers with initial lead of 10 meters and initial lift of 2 meters including cost of all labour charges etc., complete as per standard specification 23 & 24 vi (s2) vii.9,10 centering with steel centering for revetment, drain and culvert above 1.20m depth using ms sheet of size 0.90x0.60m 10 gauge thick and stiffened with ms 'l' angle wood runners of size 0.075 x 0.05 three rows with support by casurina pullys 0.075 cm at 0.45 m l
Sector: Municipality