Details: earth work in excavation by mechanical means (hydraulic excavator)/m means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 1 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by engineer-in-charge. 2.6.1 all kinds of soil filling available excavated earth (excluding rock) in trenches, pli sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work up to plinth level : 4.1.8 1:4:8 (1 cement : 4 coarse sand (zone-iii) : 8 graded stone aggregate 40 mm nominal size) shuttering for fdn pcc 4.3 centering and shuttering including strutting, propping etc. and rem of form work for : 4.3.1 foundations, footings, bases for columns centering and shuttering including strutting, propping e
Sector: Power Sector