Details: earthwork excavation in ordinary soil with initial lead and lift etc., complete. as per standard specification.(narrow excavation) supply and filling with m sand in layer of 150mm thick including water sourrounding into consolidation etc., complete. plain cement concrete 1:4:8 mix using 20mm iss gauge hbbg metal etc., complete. as per standard specification.(using with m sand) providing steel centering and shuttering without strutting sites and soffits arrangements etc., complete. as per standard specification. supply cutting bending tying and fixing in position of ms (or) rts grills for rcc work including cost of steel and binding wire etc., providing and laying in position standardised concrete mix m-20 grade in accordance with is 456 - 2000 using 20mm and down graded hard broken granite stone jelly for all rcc items of works with minimum cement contenet of 325kg/ and maximum water cement ratio of 0.55 including admixture (plasticiser / super plasticiser) in recommended proportion
Sector: Municipality