Details: charges for dismantling mill outlet elbow/bends/coal pipes after suitably supporting the adjacent coal pipes wherever required, removing, lowering them to ground floor from various heights and placing them in unit-iv as directed by the engineer in-charge, including charges for temporary support, platform, scaffolding, cutting gas, welding electrode etc and the hire charges for t&p’s. charges for removing coal choke up of mill outlet elbow/bends/coal pipes and patch welding if required, lifting the mill outlet elbow, bends/coal pipes and fitting them in correct position aligning with vertical straight pipe and renewal of victaulic coupling gasket 20l and aligning reassembling and also renewal of kicker blocks if necessary, removing the temporary supports including cost of consumables such as cutting gas, m.s electrode etc.,
Sector: Power Sector