Details: earth work excavation for foundation in hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders ss.20b and sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 (for drain & culvert) plain cement concrete with hard broken granite stone jelly using 40mm gauge in cement concrete 1:4:8 (one cement four sand and eight aggregate) for foundation including cost and conveyance of all materials and all other incidental charges etc., complete complying with standard specifications. providing centering for sides and soffits of r.c.c.works such as lintels, slab with beams plain surface etc., complete including shuttering upto 3.30 m height using mild steel sheet of size 90 c.m x 60 c
Sector: Municipality