Details: earth work excavation for foundation in all soils and sub soils and to full depth as may be required except in rock requing blasting but inclusive of shoring, strutting and bailing out water whereever necessary and refilling the sides of foundation with excavated soil other than sand in layers of not more than 15cm thick well rammed and consolidated and depositin the surplus earth with in the compound in places shown bythe departmental officers with an initial lead of 10m and lift of 2m and levelling the same etc completed complying with standard specifications and drawings. supplying and filling in foundation, basement, etc with filling stone dust in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. cement concrete 1:4:8 (one cement and four sand and eight aggregate) using 40mm hard broken granite stone jelly for rcc works etc., complete complying with standard sp
Sector: Municipality