Details: dismantling the existing damaged plain cement concrete flooring including removel of deprices from site etc., complete as diercted by the dept officers. earth work open excavation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the excavated earth with a lead of 10 mts. within the compound in places shown by the departmental officers and clearing and levelling the site, etc., complete complying with standard specification. providing and laying, spreading and compacting graded stone aggregate to wet mix macadam (wmm) specification including premixing the material with water at omc in mechanical mix plant carriage to mixed material by tipper to site laying in uniform layers with paver in sub base / base course on well prepared surface and compacting with vibratory roller to achive the desired density complete as per clasue 406 of morth specifications. ea
Sector: Municipality