Details: supplying, fabricating and placing in position of ms/rts steel reinforcement for rcc works including labour for cutting, bending, tying and laying in position as per specification including cost of all materials, labour, etc., complete. rcc 1:2:4 using 12.20 mm hbg store jelly for slabs including cost of all materials, form work, lead, lift, labour and writing of serial number, date of manufacturing & name of the contractor over every slab etc., complete. transporting from curing tank, handling and planning in position of rcc slabs.
Sector: Power Sector