Details: picking the existing bt surface upto 50mm depth as directed by the departmental officers and collecting the picked up salvaged metal and stacking the same for reuse and deposting the debris excluding cost of materials including all labour charges for pickig and all other tools and plants employed for the work and including all other incidental charges etc., complete, as per morth specification. morth no. 111, 112, 501, 504, 900, 3004 road b excavation for roadway and drainageexcavation including removal and satisfactory disposal of all materials necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross sections shown in the drawings or as indicated by the engineer, as per morth specification. box cutting for widening portion. morth no. 111, 112, 301, 305, 900 road a granular sub-base with graded material (table:- 400-1) - plant mix method construction of granular sub-base by providing close graded material,
Sector: Road development