Details: geophysical survey charges including conveyance charges for the geophysical instruments and other accessories. drilling of borewell inside well 150mm dia for hard rock including cost of all labour charges and transportation,hire charges for rigs, fuel charges etc.complete. supply and delivery of 200mm pvc casing pipe including cost of pipe and conveyance charges and all material and all labour charges etc.complete.(twad 2022-23 slno.1.1 pg no.22) labour charges for inserting pvc casing pipes assembly (with slots or without slots) in the drilled hole including jointing the pipes with pvc couplers with cement paste etc., complete, supply and packing the annular space with pebbles of size and quality as approved by the executive engineers of twad board. page no.301 supply and delivery of single phase 3.0 h.p submersible pump set as per is 8034 without panel board 50 lpm 100m head including cost of pump set and conveyance charges etc complete. supply and delivery of three phase panel bo
Sector: Municipality