Details: picking the existing bt surface upto 50mm depth as directed by the departmental officers and collecting the picked up salvaged metal and stacking the same for reuse and deposting the debris excluding cost of materials including all labour charges for pickig and all other tools and plants employed of the work and including all other incidental charges etc., complete, as per morth specification for approach road road - a (for approach road) road - b (for approach road) granular sub-base with graded material (table:- 400-1) - plant mix method construction of granular sub-base by providing close graded material, mixing in a mechanical mix plant at omc, carriage of mixed material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 of morth specification no.111, 112, 401,900 - for grading- iii material for approach road road - b (box culvert) granular sub-ba
Sector: Road development