Description: same as above Name of Work Supply Installation Testing and Commissioning for creation of 100KVA Substation near Skinsethang Nurla on full turnkey basis under District Capex 2025 26
Details: DT (Supply Part) 100KVA, 11/0.433kV, 3-phase Distribution Transformers with Bimetallic Terminal Connectors Energy Level- 2, and with LV Cable Box having detachable Aluminium Gland plate Gapless Surge Arrestor,9 kV ,10 kA ,LA with polymer housing, Stn. Type 11kV GO, AB Switch 3-Phase, 3-Pole, 200 Amp, Vertical Type 11 kV Horn Gap Fuse Set 3 Phase 200A 120mm² Cable, 1.1kV Grade, PVC Insulated Stranded Conductor FRLS type 9 Mtr. Long Pole,ST-410 SP33) 33kV Polymeric composite Disc Insulator 12kV,min failing load 45kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm GI Channel/Angle/Flat of sizes including clamps Galvinized Nuts and Bolts. Earthing of substation --Excavation of earth pit of dia 650 mm & depth 3000 mm, installation of Earthing pipe of 40 mm Nominal bore & 4mm wall thickness & length 2.5 mtr long as Per IS 1239.GI for neutral earthing of size 25 mm x 3 mm for connection of transformer body,G.O Set & lightening arrestor as per IS 2629/85, GI
Sector: Power Sector