Description: same as above Name of Work Supply Installation Testing and Commissioning for Creation of Distribution Sub Stations at various locations of Leh District 100KVA at Shakbar Khaldo Hanlay Changthang on full turnkey basis under SDP 2025 26
Details: DT (Supply Part) 100 KVA, 11/0.433kV, 3-phase Distribution Transformers with Bimetallic Terminal Connectors Energy Level- 2, (Aluminium wound upto 200kVA, Copper wound for 250kVA or higher kVA ratings) , and with LV Cable Box having detachable Aluminium Gland plate Gapless Surge Arrestor,9 kV ,10 kA ,LA with polymer housing, Stn. Type 11kV GO, AB Switch 3-Phase, 3-Pole, 200 Amp, Vertical Type 11 kV Horn Gap Fuse Set 3 Phase 200A 120 mm² (2Ckt) Cable, 1.1kV Grade, PVC Insulated Stranded Conductor FRLS type for 25/63/100KVA & 250KVA DTs 9 Mtr. Long Pole,ST-410 SP33) 33kV Polymeric composite Disc Insulator 12kV,min failing load 45kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm GI Channel/Angle/Flat of sizes including clamps Galvinized Nuts and Bolts. Earthing of substation --Excavation of earth pit of dia 650 mm & depth 3000 mm, installation of Earthing pipe of 40 mm Nominal bore & 4mm wall thickness & length 2.5 mtr long as Per IS 1239.GI for neut
Sector: Power Sector