Description: same as above Name of Work Supply Installation Testing Commissioning for Creation of 100KVA Substation at Saboo Meyak 100KVA Substation at Rampirpur thiksay and 100KVA Substation at Stok Thang along with laying of HT LT line at Shey Section under UT Capex 2025 26
Details: DT ( Supply Part ) Supply of 100KVA, 11/0.433kV, 3-phase Distribution Transformers with Bimetallic Terminal Connectors Energy Level- 2, (Aluminium wound upto 200kVA, Copper wound for 250kVA or higher kVA ratings) , and with LV Cable Box having detachable Aluminium Gland plate Supply of Gapless Surge Arrestor,9 kV ,10 kA ,LA with polymer housing, Stn. Type Supply of 11kV GO, AB Switch 3-Phase, 3-Pole, 200 Amp, Vertical Type Supply of 11 kV Horn Gap Fuse Set 3 Phase 200A Supply of 185mm² Cable, 1.1kV Grade, PVC Insulated Stranded Conductor FRLS type for 100kva DTs Supply of 9 Mtr. Long Pole,ST-410 SP33) Supply of 33kV Polymeric composite Disc Insulator 12kV,min failing load 45kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm Supply of GI Channel/Angle/Flat of sizes including clamps Supply of Galvinized Nuts and Bolts. Supply of Earthing of substation --Excavation of earth pit of dia 650 mm & depth 3000 mm, installation of Earthing pipe of 40 mm
Sector: Power Sector