Description: same as above Name of Work Supply Installation Testing and Commissioning for HT Extension works in various locations of Leh District Shey and saboo section on full turnkey basis under UT Capex 2025 26
Details: SUPPLY PART Supply of 9 Mtr. Long Pole,ST-410 SP33) GI V cross-arm with top Bracket including clamp as per specification(14.631Kg/complete V-set) Supply of GI Channel X-arm including clamps and braces for DP (80Kg/DP) Supply of 30 mm² ACSR Conductor Supply of 33kV Polymeric composite Pin Insulator 36kV, 10kN, Lighting Impulse 170kV Positive and 180kV Negative, creepage distance 900mm Supply of 33KV Polymeric Composite Disc Insulator 36KN, min failing load 70KN, Lightining Impulse 170KV Positive and 180KV Negative, Creepage distance 900mm Galvanised Stay Set with 50x8mm stay clamp, guy insulator(2Nos.), anchor plate (200x 200 x 6 mm), nut-bolts, 2 Nos turn-buckles, 1.8m long, 16 mm diameter solid GS stay rod & 7/3.15 mm dia GI stranded wire complete Supply of Galvinized Nuts and Bolts Supply of Danger Plates with Clamps Supply of Anti-Climbing Device with Clamps Supply of Earthing Complete by GI Spiral/Rod 20mm 2.5 mtr long through GI . Supply of Red Oxide Supply of Aluminium Paint Su
Sector: Power Sector