Details: lt line (supply part) 8 mtr. long pole( st-410 sp15) gi channel x arm (75x40x6mm) 2ft along with gi clamp, 50x8mm, (2ft=4kg, 1no. clamp=0.83kg=total weight=4.83 kg) 30 mm² acsr conductor 16kn polmer shacle insulators galvinized nuts and bolts earthing complete by gi pipe 40 mm or gi rod 20mm 2.5 mtr long through gi . red oxide aluminium paint cement bottoming 1:2:4 mix as per rec standards .45cum /pole lt line (installation/testing/commissioning part) 8 mtr. long pole( st-410 sp15) gi channel x arm (75x40x6mm) 2ft along with gi clamp, 50x8mm, (2ft=4kg, 1no. clamp=0.83kg=total weight=4.83 kg) 30 mm² acsr conductor 16kn polmer shacle insulators galvinized nuts and bolts earthing complete by gi pipe 40 mm or gi rod 20mm 2.5 mtr long through gi . red oxide aluminium paint cement bottoming 1:2:4 mix as per rec standards .45cum /pole
Sector: Power Sector