Details: demolishing r.b. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as perdirection of engineer-in- charge. earth work in excavation by manual means over areas (exceeding 30 cm in depth,1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by engineer-in charge. all kinds of soil filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. soling: dumping of stone including cost of stone random rubble masonry with hard stone in foundation and plinth includinglevelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with : cement mortar 1:6 (1 cement : 6 coarse sand) providing
Sector: Power Sector