Details: surface dressing of the ground, including removing vegetation and inequalities not exceeding 15 cm depth and disposal of , lead upto 50 m and lift upto 1.50 m. a) ordinary soil earth work in excavation in foundation and trenches in soils containing 50% or more of shingle or small size boulders upto 30 cm size, lift upto 1.50 m and stacking the excavated soil not more than 3 m clear from the edge of the excavation and returning the stacked soil in soil not more than 3 m clear from the edge of the excavation and returning the stacked soil in 15 cm layers when required, into plinth, sides of foundation etc consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated soil as directed within a lead of 50m.earthworkinexcavation insoilscontaining 50%ormoreofshingle orsmallsize boulders upto 30cmsize including banking in20 cmlayers andbreaking clods, ramming anddressing upfor the purpose of making embankments or filling up ground depressions lead upto
Sector: Renewable Energy