Details: overall project cost of inr up to 50 crores survey,soil testing detailed project report(dpr)(preparation of working drawing structure etc) overall pmc(pre and post construction,post commissioning) for overall project cost of > inr 50 crores and ≤ inr 150 crores survey,soil testing detailed project report(dpr)(preparation of working drawing structure etc) overall pmc(pre and post construction,post commissioning) for overall project cost of > inr 150 crores survey,soil testing detailed project report(dpr)(preparation of working drawing structure etc) overall pmc(pre and post construction,post commissioning)
Sector: Water supply and Sewerage