Details: collection & transportation of bitumen from chennai ioc limited and carriage by mechanical transport i/c loading into truck at collection site, unloading at chennai port i/c storage during transit and before shipment all loads and lift shipment of the materials at chennai port vessels bound for various stations as indicated below i/c payment of chennai port charges and loading charges and ship freight charges, bunker charges etc. and delivery the bitumen to the following officials under south andaman division (sad), sri vijayapuram or as per the direction of engineer-in-charge at sri vijayapuram. under ae-i (sri vijayapuram wharf to work site for an average lead of 5km) vg-10 = 13.20 mtvg-30 = 34.30 mt total = 47.50 mt (a) under ae-iv (sri vijayapuram wharf to work site for an average lead of 10 km) vg-10 = 11.55 mt vg-30 = 26.40 mt total = 37.95 mt (b) under ae-v (sri vijayapuram wharf to work site for an average lead of 10 km) vg-10 = 4.95 mtvg-30 = 10.7
Sector: PWD