Details: earthwork in excavation by mechanical means (hydraulic excavator)/manual means in foundation pipeline trenches drain (not exceeding 1.5 m in width or 10 sq.m. on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 m.: a)all kinds of soil construction of embankment with approved materials deposited at site from roadway cutting and excavation rom drain and foundation of other structures graded and compacted to meet requirement of table 300-2 as per morth specification 305 spreading the earth/hard soil in layers not exceeding 250 mm in depth breaking clods, watering rolling each layer with half ton roller or wooden or steel hammers and rolling every third and topmost layer with power toller of minimum 8 tonne and dressing up in embankment for roads, flood banks, marginal and guide banks and filling up of ground dressing etc. complete rubble packing with
Sector: Municipality