Details: clearing grass and removal of upto a distance of 50 m outside the periphery of the area earthwork in excavation by mechanical means (hydraulic excavator)/manual means in foundation pipeline trenches drain (not exceeding 1.5 m in width or 10 sq.m. on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 m. all kinds of soil earthwork in excavation over areas in saturated soil (exceeding 0.30 m upto a depth of 0.60 m) including disposal of excavated earth lead upto 50 m and lift upto 1.5 m disposed earth to be neatly dressed and leveled including pumping or bailing out water extra for earthwork excavated in saturated soil for every 0.30 m depth or part thereof over 0.60 m depth below water table including pumping and bailing out water demolishing laterite stone masonry in cement mortar including stacking of serviceable material & disposal of unservicea
Sector: Power Sector