Details: dismantling the tile work in floors and roofs laid in cement including stacking of materials within 50 meters lead for thickness of tiles 10mm to 25mm. demolishing cement concrete 1:3:6 or richer mix including disposal of material within 50 m lead. dismantling and removing mangalore roofing tiles from roofs including ridges, hips, valleys, sheets wind ties etc. but excluding battens, roof timber etc. and stacking materials within a distance of 50 mt. repairs to plaster in patches of 2.5 sq.m and under including cutting the patch in proper shape and preparing and plastering the surface of the walls complete including disposal of to the dumping ground within 50m lead.with cement mortar 1:4 (1 cement : 4 fine sand) removing white or colour wash by scrapping, sand papering and preparing surface smooth including necessary repairs to scratches etc. complete. earthwork in excavation by mechanical means (hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in wid
Sector: Sports