Details: removal of holes and depression by laying granitic or basaltic stone of 40mm/20mm/10mm/6mm nominal size in layer as per requirement including 80/100(or such bitumen material of grade and type as specified by the engineer-in-charge) at 68 kg/cu.m. (average) on existing road surface including rolling etc. complete as per specification including cost of bitumen. cleaning of the existing black topped surface with brooms, soft brushes and finally dusting with old gunny bags and/or compressed air to receive bituminous treatment. etc. complete. providing and applying tack coat with bitumen grade of 80/100 or bitumen emulsion using pressure distributor on the prepared bituminous/granular surface cleaned with mechanical broom as per mort&h specifications clause 503. bitumen 80/100@ 0.375 kg/sq.m. providing and laying bituminious concrete with 40-60 tph drum mix type hot mix plant producing an average output of 50 tonnes per hour using crushed aggregates of specified grading, premixed with bi
Sector: Municipality