Details: transportation of k.t gates carefully from dhat farm godown in v.p mollem to river bank and from river bank to godown vice versa by means of mechanical transport including loading and unloading and stacking them serially in order of placement as directed by the engineer in charge to right side of river bank by manually including keeping in proper stacking etc. complete as directed by the engineer-in-charge. earthwork in excavation by mechanical means (hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sq.m on plan) including disposal of excavated earth lead upto 50 m and lift upto 1.5m disposed earth to be leveled and neatly dressed including providing barricading, danger lighting guarding as directed in : ) all kinds of soil conveying carefully the k.t. gates form the river bank ( stack ) fixing in between the piers of bandhara in including fixing with rubber seal nut & bolts with washers ( excludi
Sector: Water Resource Department