Description: REPLACEMENT OF LENGTHY LT NETWORK WITH HT SUPPLY AND OF MATERIALS FOR CONSTRUCTION OF NEW 11 KV LINES NEW DISTRIBUTION TRANSFORMER SUBSTATION AND NEW ABC LT LINES UNDER RDSS Name of Work Development of Distribution Infrastructure at Mokokchung and Longleng Districts of Nagaland under the Revamped Reforms based and Results linked Distribution Sector Scheme Replacement of Lengthy LT network with HT Supply of Materials for Construction of New 11 kV Lines New Distribution Transformer Substation and New ABC LT lines
Details: (A) Supply of Materials for construction of 11 kV Line with Weasel conductor (9.5 M GI STP SP-35 Pole) GI Steel Tubular Pole SP-35(9.5M) GI Channel 100x50x5 mm, 3.5 M Length weighing approx 9.60Kg/Mtr GI Angle 65X65X6 mm, 1.5 M Length weighing approx 5.8 Kg/Mtr for 1Pole (SP) Brackets GI Angle 65X65X6 mm , 5 M Length weighing approx 5.8 Kg/Mtr for 2Pole (DP) Bracing - GI Angle 65X65X6 mm, 5M Length weighing approx 5.8 Kg/Mtr for Road Crossing Pole Double Clamp of G.I flat 50x6 mm suitable for GI SP 35 ST Pole dia - 90 mm (Top Section ) weighing 1.4 kg per pair Pole Single Clamp of G.I flat 50x6 mm suitable for GI SP 35 ST Pole dia - 90 mm (Top section) weighing 0.7 kg each for SP Brackets dia - 115 mm (Middle section ) weighing 0.84 kg each for DP Bracing & Crossing GI Nuts (heavy) & Bolts (full thread) of following sizes 16 mm dia x 250mm ((5/8"x10") each weighing 0.50 kg 16 mm dia x 150mm ((5/8"x6") each weighing 0.348 kg 16 mm dia x 75mm ((5/8"x3") each weighing 0.23 kg GI
Sector: Power Sector