Details: earth work in excavation by mechanical means (hydraulic excavator) / manual means over areas on all depths and widths including getting out and disposal of all excavated earth to be neatly dressed in all leads, lifts and carriage of material as directed by the engineer-in-charge. a). ordinary rock. providing and laying in position cement concrete of :5:10 (one cement : five sand : ten graded stone aggregate 40 mm (forty milimetre) nominal size excluding the cost of centering and shuttering - all work up to plinth level complete in all respect as per satisfaction of engineer-in-charge. providing and laying in plain cement concrete 1:1½:3 (one cement: one and half coarse sand) : three graded stone aggregate 20 mm nominal size) excluding the cost of centering and shuttering - all work up to plinth level etc. complete as specified and as directed by the engineer-in-charge. steel reinforcement for r.c.c. work including straightening, cutting, bending, placing in position a
Sector: Agriculture Misc