Description: Left bank Reservoir Rim protection from RD 1200m to 1355m upto EL 1159m of Chamera II Power Station Phase 1 HP Package No Dam 994 Name of Work Left bank Reservoir Rim protection from RD 1200m to 1355m upto EL 1159m of Chamera II Power Station
Details: Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge. All kinds of soil Untensioned rock dowel/anchor/bolt including cost of cement/resin (25mm dia). Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size). Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete. Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe500D or more. Providing and laying in position specifie
Sector: Generation