Description: Slope stabilization with Geo Green Erosion Control Blanket and R Wall behind GIS building at Chamera III Power station Dharwala Distt Chamba H P Pkg No PHC 03 Name of Work Slope stabilization with Geo Green Erosion Control Blanket and R Wall behind GIS building at Chamera III Power station Dharwala Distt Chamba H P Pkg No PHC3 03
Details: Demolishing stone rubble masonry manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge: Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. All kinds of soil Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 Cement : 2 coarse sand) : 4 graded stone aggregate 40 mmnominal size) Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, p
Sector: Generation