Details: stone soling properly hand packed filling interstices with kharanja stone and consolidating with power road roller to the required gradient and comber including spreading, watering and rolling of binding materials moorum or earth etc. complete as per hppwd specification. 100mm spread thickness (finished work including materials and labour) providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kn static roller in stages to proper grade and camber, applying and brooming, stone screening/binding materials to be fill-up the interstices of coarse aggregate, watering and compacting to thr equired density grading 1 as per technical specification clause 405. by mechanical means preparation of surfaces by brushing with wire brushes for removing caked mud etc. sweeping with brooms and finally fanning the cleaned surface with gunny bags to remove a
Sector: Municipality