Details: earth work in excavation by mechanical means (hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by engineer-in charge. all kinds of soil centering and shuttering including strutting, propping etc. and removal of form for; walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work up to plinth level :1:2:4 (1 cement : 2 coarse sand) : 4 graded stone aggregate 20 mm nominal size) providing and laying 60mm thick factory made cement concrete interlocking paver block of m -30 grade made by block making machine with strong vibratory compaction, of approved size, design & shape, laid in required colour and pattern over and including 50mm thick compacted bed of coarse
Sector: Generation