Details: claearing of silt/malwa from infiltration gallery/whs/check dam including geeting out the excavated soil and disposal of surplus excavated soil as directed complete in all respect and to the entire satisfaction of the engineer-in-charge. excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth upto 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and then disposing of surplus excavated soil as directed, within all lead and lifts including restoration of unmettalled surfaces to its original condition complete in all respect and to the entire satisfaction of the engineer-in-charge. earth work in excavation by mechanical means / manual means in foundation, trenches or drains, pits upto all depths in all classification of earth work such as pick work
Sector: Agri Marketing