Details: drilling, lowering of assembly & development of tubewell-i, 80 mtrs depth (rotary rig) at village toka nagla, g.p. kundiyon, tehsil paonta sahib, district sirmaur (h.p) earth work in excavation by mechanical means (hydraulic excavator) / manual means in foundation, trenches or drains, pits upto all depths in all classification of earth work such as pick work, jumper work, saturated soil including bailing and pumping out water, chieselling soft / hard rock including dressing of sides and ramming of bottoms, including getting out the excavated soil and disposal of surplus excavated soil as directed, within all leads and lifts complete in all respect and to the entire satisfaction of the engineer-in-charge. providing and laying in position cement concrete 1:4:8 (1 cement: 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) and curing complete excluding the cost of centering and shuttering complete in all respect within all leads and lifts and to the entire satisfaction of the
Sector: Agri Marketing