Details: demolishing r.c.c work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres as per direction of engineer in charge. clearance of silt/malva including getting out the excavated soil and disposal of surplus excavated soil within lead of 50m. as per direction of engineer in charge. earth work in excavation by mechanical means (hydraulic excavator) / manual means in foundation, trenches or drains, pits upto all depths in all classification of earth work such as pick work, jumper work, saturated soil including bailing and pumping out water, chieselling soft / hard rock including getting out the excavated soil, dressing of sides, ramming of bottoms and returning the soil as required in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and then disposing of surplus excavated soil as directed, within all leads and lifts complete in all respect and to the entire satisfac
Sector: Agri Marketing