Details: mobilisation & demobilisation of 2 compressor with 2 dg sets and 4 jack hammers including necessary pipelines and obtaining of explosive licenses and deployment of skilled manpower and licenses blaster at site construction of 4(four) number of drifts by manual mucking on different levels on both the abutments of dam and extension of 1(one) number of drift by manual mucking in the power house site as per the technical specifications including cross cuts, drainage, timber supports using b-class wood of specified size as per technical specification, illumination and assistance during logging and maintenance for 1 year after completion of wooden support using b-class wood of specified size as per technical specification in already excavated drift at power house location including cost of materials, fitting and fixing in position complete with cost of all labour, t&p and transport as per direction of engr. in-charge.
Sector: Power Sector