Details: maintenance of earthen shoulder (stripping of excess soil)stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor at omc as per drawing and mord technical specification clause 1903. road side pucca drainsconstruction of road side pucca drain with m10 (1:3:6 with jhama brick aggregate) to specified lines, grades, levels and dimensions as per approved design and mord technical specification clause 307, 1606. excavated material to be used in embankment at site. (including centering, shuttering, etc. but excluding reinforcement)d) u shaped drain (top clear width 600 mm, bottomclear width 600 mm and clear depth of 600 mm) brick solingiii) brick edging laid in full brick widthproviding and laying brick edging on prepared subgradeaccording to lines, grades and cross-section shown on the drawing, filling joints with earth, free from clay with a plasticity index not exceeding 6, watering and rolling the same with three wheeled road rolle
Sector: Buildings