Details: excavation for structureswithout dewatering.earthwork in excavation for structures as per drawing and mord technical specifications clause 305.1 including setting out, construction of shoring & bracing, removal of stumps & other deleterious material and disposal upto a lead of 50 m, dressing of sides & bottom and backfilling in trenches with excavated suitable material.i.ordinary soili) upto 3 m depth filling in foundation trenches as per drawing & mord technical specification clause 305.3.9, 1200i.sand filling providing concrete for plain concrete (using jhama brick aggregate) in open foundations complete including formwork as per drawings & mord technical specifications clauses 802, 803, 900, 1202 and 1203. (including centering, shuttering, staging etc. but excluding reinforcement)i) p.c.c grade m 10( using jhama brick aggreagte)i) nominal mix 1:3:6 (hand mixing) brick masorny work in cement mortar in foundation completed excluding pointing & plastering as per drawing & mord technica
Sector: Buildings