Details: a-road work excavation for structuresb. with dewatering.earthwork in excavation for structures as per drawing and mord technical specifications clause 305.1 including setting out, construction of shoring & bracing, removal of stumps & other deleterious material and disposal upto a lead of 50 m, dressing of sides & bottom and backfilling in trenches with excavated suitable material. (i) ordinary soil(i) upto 3 mtr. depth. filling in foundation trenches as per drawing & mord technical specification clause 305.3.9, 1200i. sand filling providing concrete for plain concrete (using jhama brick aggregate) in open foundations complete including formwork as per drawings & mord technical specifications clauses 802, 803, 900, 1202 and 1203. (including centering, shuttering, staging etc. but excluding reinforcement)ii. p.c.c grade m 10 (using jhama brick aggregate)(i) nominal mix (1:3:6) plain/reinforced cement concrete in substructure complete including formwork as per drawings & mord technical
Sector: Buildings