Details: maintenance of earthen shoulder (stripping ofexcess soil)stripping excess soil from the shoulder surface toachieve the approved level and compacting withplate compactor at omc as per drawing and mordtechnical specification clause 1903. maintenance of earthen shoulder (filling with freshselected soil)making up loss of material/ irregularities onshoulders to the design level by adding freshapproved selected soil and compacting it withappropriate equipment at omc upto a lead of 1000m as per mord technical specification clause 1903. maintenance of bituminous surface road using jhama brickaggregaterepair to holes by removal of failed material, trimming the sides to vertical and levelling the bottom, cleaning the same withcompressed air or any appropriate method, filled with b.m (usingjhama brick aggregate & bitumen of vg-30), after applying primecoat at the bottom and tack coat on sides and on bottom (usingbitumen emulsion) and compacting, trimming & finishing thesurface to form a smooth
Sector: Buildings