Details: sh: earthwork and drainage (i) excavation in cutting in soil by manual means with lead upto 50 m excavation in roadway cutting in soil by using manual means for carrying of cut earth to embankment site with all lifts and lead upto 50 m as per mord technical specification clause 302.3. (ii) excavation in soil with dozer with lead upto 100 m.excavation for roadway in soil by mechanical means with dozer including cutting and pushing the earth to site of embankment upto a distance of 100 m, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections as per mord technical specification clause 302.3. construction of embankment with material obtained from roadway cuttingconstruction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of tables 300.1 and 300.2 as per mord technical specification clause 301.5.a.for spr
Sector: Buildings