Description: Mtc of Khedacherra PHC and Quarter Complex Buildings under Damcherra Sub Division PWD R and B at Khedacherra PHC during the year 2021 to 2022 SH Plastering water proofing treatment ceiling wood works sanitary etc of quarter buildings 1st Buildin Name of work Mtc of Khedacherra PHC Quarter Complex Buildings under Damcherra Sub Division PWD R B at Khedacherra PHC during the year 2021 22 SH Plastering water proofing treatment ceiling wood works sanitary etc of quarter buildings 1st Building 2nd Building
Details: Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.-All kinds of soil Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.-All kinds of soil Supplying and filling in plinth, under floor, foundations etc. with sand (fine) from local quarry with all lifts including spreading in horizontal layers, watering, grading to required , ramming, consolidating and compacting each layer by using plate compactor or by any suitable method complete. Providing and laying in position cement concrete of specified grade excluding the c
Sector: Buildings