Details: construction of embankment with material obtained from borrow pitsconstruction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required and compacting to meet requirement of tables 300.1 and 300.2 with a lead upto 1000 m as per mord technical specification clause 301.5. 20 mm thick open graded premix carpet using bituminous (viscosity grade/ modified bitumen) binder.providing,laying and rolling of open graded premix carpet of 20 mm thickness composed of 13.2mm to 5.6mm aggregates either using grade bitumen or emulsion to required line grade and level to serve a wearing course on a previously prepared base including mixing in a suitable plant laying and rolling with a three wheel 80-100 kn static roller capacity finished to required level and grades to be followed by seal coat of either type-a or type-b or type-c or
Sector: Buildings